15 Apr, 2023

Aluminum tube cutting for frame making 17th& 18th floor
T6 6th &7th floor lobby aluminum wip
T6 9th floor fire shaft area tile fixing
T6 12th floor Aluminium framing fixing
T6 14th floor upvc window glass fixing
T6 14th floor aluminium framing fixing
T6 19th floor light fixing
T6 Entrance lobby fire shaft area tile fixing
T6 Terrace bric cova f. No-3 in progress
T6 terrace monkey flat wp& cleaning in progress
T6 terrace plaster repairing
T6 Terrace wp wip